Project: AUGUST and KO 350 kW Solar Power Plant Project
The project implementation lasted 6 months, of which the installation work took one month. 834 BLACKSTAR solar modules, capable of reaching 350 kW power, were installed on the roof of the AUGUST ir KO building. A grid-like mounting system for the solar modules was used during the installation of the solar power plant, allowing the weight of the power plant to be distributed evenly.